From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:49 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Anmar ALQARAGHULI 

Last updated:  04/24/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Dallas, TX  75231
US

Mobile: 469-952-8551   
Home:
469-579-7465
anmar.adnan@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Anmar ALQARAGHULI

Resume Value: kr54ydiypizx4dpt   

  

 

Anmar ALQARAGHULI                                              

 

 

1(469) 952 8551                                                                       anmar.adnan@gmail.com

 

Skills

·          Project Management Institute PMI/ Fort Worth Chapter.

·          Specialist in Primavera (P3/P6) Project Planner for Scheduling and Cost Planning.

·          Strong knowledge of Microsoft Project, Microsoft Office (Excel, Word, Power Point, Outlook), and Internet Application

·          Generate reports (daily, weekly, monthly) and special budget graphs.

·          Experience in HSE, health and safety as Instructor.

·          Utilizing PRIMAVERA Unifier business management.

·          Utilize MS SharePoint as a user by uploading or making new nodes for resources and/or purchase order.

·          Efficient to build a good teamwork relationship, utilize skills of workforce.

·          EPC Project Management, Scheduling, Cash flow and Cost Control.

·          Utilizing all Scheduling Methodology, CPM Critical Path Method, CCPM Critical Chain Project Management.

 

 

 

Education

·          B.S. in Civil Engineering, and Construction Project Management /University of Technology  Jun, 2002

·          (Three Phase Construction Control)   by the project control specialists of Parsons BHE project    Oct, 2004

·          Project Control  and Project Management by the project control certified Professional of AFCEE (US Air Force Center for Engineering and the Environment)    Apr, 2006

·          CSHO (Certified Safety and Health Official) in General Industry.

·          CSHO (Certified Safety and Health Official) in Construction Industry.

·          OSHA 510 - Standards for the Construction Industry/UTA-University of Texas in Arlington.Apr,2013

·          OSHA 511 - Standards for the General Industry/UTA-University of Texas in Arlington.Apr,2013

 

 

 

Professional Experience

Project Control Lead Scheduler / General Electric     (GE Transportation)                                                                            Feb 2013 – Now

                   (Heavy Construction Project , Railways, Bridges and EPC Construction)

·          Succeeded working with projects team to define the list of deliverables by using (Primavera P6 v 8.2); leaded the project team to define the work breakdown structure (WBS) to represent the project scope into deliverables.

·          Developed a control baseline schedule and updated the changes on activities on (weekly, biweekly and monthly) bases.

·           Performed schedule risk analysis and periodic baseline schedule maintenance.

·          Tracked all PO’s, Invoices and Manufactured items, wiring and assembling, then shipment for the cars (locomotive and Racks).

·          Owned the overall schedule monthly progress update cycle, forecast, critical path and trend analyses. Developed status reporting framework and provided regular and comprehensive schedule status reports to Project Management.

·          Prepared cost / resource loaded schedules for projects. Monitored and Itemized projects work progress.

·          Provided training and assistance to junior level planners as needed.

·          Managed and Controlled work progress and ensured CPM activities within acceptable float defined through P6.

·          Participated and facilitated project schedule review meetings and attended other project meetings.

·          Assisted management in determining resource requirements (Material, Labor) needed for each period or phase.

 

 

 

 

 

 

 

 

 

 

 

 

Project Control Engineer / United States Army Corps of Engineers (USACE)                                                                         May 2006 – Jan 2013

             (Heavy Construction Project , Power Sub-Stations, Pipe line, Power Plant and Vertical Construction)

·          Developed a baseline schedule and maintain the up to date schedule on weekly bases.

·          Provided and coordinated the construction planning and scheduling systems, work processes, and reports needed to support the construction management efforts of the project.

·          Participated in periodic reviews of the project with respect to its schedule, design and/or construction cost, and prepare progress reports on a regular basis to USACE management and the client’s representatives as needed.

·          Acted as a communication link between all company representatives, management, contractors and any other parties involved in the design or construction process

·          Evaluate contractors schedule prior to inserting into the Master Schedule using Primavera P6 software

·          Provided the Variances reports based on the (CPI) Cost Performance Index which is effected by the (EVOWP) Earn value Of Work Performed

·          Directed the inspections and reviews necessary at the close of a project to ensure that check lists are completed.

·           

 

Project Control Engineer / Parsons, Building, Health and Education Program                                                                    May 2003 –   Apr 2006   

                    (Heavy Construction Project , Highways, Bridges, Hospitals and Vertical Construction)

·          Analyzed and developed a new (WBS) Work Breakdown Structure for activities during the awarding process.

·          Created the (BLS) Base Line Schedule and studied the acceptable (FF) free float and (TF) total float for each phase.  

·          Developed the implements plan versus actual progress curves. Report and analyze monthly deviations from plan.

·          Evaluated the critical paths in the project schedules and evaluated alternative schedule options to identify optimum project strategies or resolve problems before and during execution

·          Prepared and administered all aspects of schedule planning and control including change management and vendors.

·          Established quality control plans as well as the safety plans for each project.

·          Performed resource loading and leveling, logic diagrams and analyses, critical path two week looks ahead, and overall network analysis for senior management decision making

 

 

 

              Civil Construction Engineer / DynCorp International                                                                                                                 Mar 2002 – Mar 2003 

 

·          Studied specifications and plans construction activities based on project start and completion dates. Determines required tasks, sequencing, and required completion times.

·          Provided engineering and technical analyses and assessments for the development and implementation of routine projects.

·          Responsible for preparing and maintaining calculations as required by the project plan for submittals for any applicable permits or client review

·          Performed preliminary engineering design and reviews the design and drafting work of junior engineers, designers or drafters.

·          Prepared cost and man-hour estimates, job budgets and schedules.

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Lead Scheduler

GE

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

EPC Lead Scheduler

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Energy and Utilities
Construction - Industrial Facilities and Infrastructure

Occupation:

Engineering

·         Civil & Structural Engineering

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US

Relocate:

Yes

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

Arabic

Fluent

English

Fluent